Testing & Commissioning
Verified. Then energized.
We test, commission and verify electrical and mechanical systems from the factory floor to final handover. Every reading is traceable, every result is documented, and every system is proven against its design intent before it carries load. Our engineers work across power, protection, generation, mechanical and cooling plant, with diagnostics that keep assets healthy long after handover.
Factory acceptance (FAT)
We witness factory acceptance tests on the client's behalf, checking routine and type-test evidence against the specification before equipment ships.
Site acceptance & pre-commissioning (SAT)
After installation, we inspect and test every item on site — insulation, ratios, wiring, settings and functions — before any system is energized.
Energization & integrated systems testing
We plan and support first energization, then prove systems working together: load transfer, protection under real conditions, plant sequences and failure scenarios.
Maintenance & diagnostic testing
Periodic and condition-based testing that reveals degradation early, trends results over time and turns data into maintenance decisions.
Disciplines
Every system, tested end to end.

Power Substations & HV/MV Equipment
Transformers, switchgear, cables and earthing — tested and commissioned to IEC, IEEE and NETA practice.
- LV · MV · HV
- GIS · AIS · RMU
- IEC · IEEE · NETA

Protection, Control & Automation
Protection relays, IEC 61850 automation, SCADA and interlocking — verified from setting to trip.
- Relays · Schemes · E2E
- GOOSE · MMS
- SCADA · RTU · BMS

Power Generation & Rotating Machines
Generators, motors, drives, UPS, batteries, solar PV and energy storage — tested under real load.
- Gensets · Motors · VFDs
- UPS · Batteries · ATS
- PV · BESS

Mechanical Systems
Pumps, HVAC, fire-fighting, piping and vertical transport — commissioned, balanced and functionally proven.
- Air · Water
- Hydrostatic · Pneumatic
- Fire pumps · Sprinklers · Alarms

Cooling Plants & District Cooling
Chillers, cooling towers, pumps, ETS and thermal storage — performance verified, efficiency measured.
- Chillers · Towers · ETS
- kW/TR · COP
- Sequences · Controls

Diagnostics & Condition Monitoring
Thermography, partial discharge, oil analysis, vibration and power quality — early warnings, clear decisions.
- On-line · Off-line
- Thermal · Electrical · Mechanical
- Baseline · Trend
Our process
Four steps to certainty.
- 1
Plan & review
We review drawings, specifications, settings and manufacturer data, then issue method statements, test procedures and inspection and test plans (ITPs) for approval.
- 2
Inspect
Visual and mechanical inspection confirms nameplate data, installation quality, terminations, earthing and labelling before any test voltage is applied.
- 3
Test
Qualified engineers execute each test to the approved procedure and the applicable standards, using calibrated, traceable instruments.
- 4
Analyse
Results are compared with factory values, standard limits and sister units. Anomalies are investigated, not just recorded.
- 5
Report & certify
You receive signed test sheets, a clear pass/fail record and a complete commissioning dossier ready for handover.
What you receive
What you receive
- Method statements & inspection and test plans (ITPs)
- Signed test sheets & test certificates
- Commissioning dossiers for handover
- Punch lists with close-out tracking
- Energization & switching records
- As-tested settings & configuration files
- Trend & asset-health reports
- Calibration certificates for every instrument used